lang-en
-

Nothing Errored. Nothing Failed. Your Delivery Just Never Arrived.
A delivery posted successfully in S/4HANA and never reached EWM. No error, no dump, nothing to investigate — because the document is waiting in a qRFC queue. An end-to-end walkthrough: which transaction to open at each hop, what the answer means, and how to get the document moving again.
-

Your Stock Changed State and Nobody Posted Anything
EWM does not store the ERP storage location on the quant. It stores a stock type, and the availability group is the bridge — configured under Goods Receipt, but governing inbound, outbound, internal movements and posting changes alike.
-

Your Picker Scans Four Barcodes to Move One Pallet. Three Are Pointless.
Four scans for a ten-metre pallet move is a default, not a requirement. What a verification profile is, why the determination step is the one people skip, and how to cut four scans to two without losing the check that matters.
-

That Field Isn’t Missing. It’s Not Configured.
Leer este post en español → Two RF screens are missing a field. Same complaint from the floor, same screenshot in the ticket: “the field isn’t there.” One of them is a ten-minute Customizing change. The other is a genuine ABAP development, with a spec, a transport and a developer’s time. Nothing on the worker’s…
-

Wave Management for Outbound Deliveries: A Full Walkthrough
The last post left you with a wave template that works. Conditions are maintained, the Warehouse Process Type has its Automatic Wave Creation indicator on, and the release method is chosen. None of that moves a single pallet. Between “the template exists” and “a picker is holding an RF gun” there is a chain of…
-

Building a Wave Template, Step by Step
The real Customizing chain behind automatic wave assignment: the WPT checkbox, condition technique, step by step, and release methods.
-

What Actually Feeds a Wave
Waves aren’t just for outbound deliveries. What actually feeds a wave, and the six attributes of a wave template.
-

The History and Roadmap of SAP EWM
SAP EWM’s full timeline, 1993 to 2027 — including the two deadlines that actually matter right now.
-

SAP WM vs SAP EWM: What Actually Changed
SAP WM and SAP EWM are different architectures from different years, not one evolution. What actually changed, and why.
-

What Actually Happened to SAP WM in S/4HANA
SAP WM’s compatibility pack in S/4HANA expired Dec 31, 2025. Here’s what that actually means and what options remain.